Hot Mix Asphalt Prices — Current Costs by State

Compare hot mix asphalt prices across regions, understand what drives costs, and find the best time to buy for your paving project. Use our asphalt cost estimator to build a complete project budget.

National Hot Mix Asphalt Price Ranges

Hot mix asphalt (HMA) is priced per ton at the plant. The price you pay depends on the mix design, plant location, current oil prices, and order volume. Here are the major mix categories and typical price ranges:

Mix TypePrice/TonCommon Uses
Dense-graded surface (9.5mm/12.5mm)$80–$130Driveways, parking lots, road surfaces
Dense-graded base (19mm/25mm)$70–$110Base/binder courses under surface layer
Superpave (PG-graded binder)$100–$160State highways, high-traffic roads
Polymer-modified (SBS/SBR)$130–$200Heavy truck routes, bridge decks, airports
Cold patch (bagged)$150–$300Pothole repair, winter patching
Porous asphalt$120–$180Permeable parking lots, low-traffic areas

Regional Pricing by State

Asphalt prices vary significantly by region due to proximity to refineries, local aggregate costs, and prevailing wage rates. Here is an approximate price comparison for standard dense-graded surface mix (plant gate price, before delivery):

Region / StatePrice Range/TonKey Factor
Texas / Gulf Coast$70–$100Near refineries, year-round paving
Florida$85–$115Limestone aggregate, year-round work
Southeast (GA, SC, NC)$80–$120Good aggregate supply, long season
Midwest (OH, IN, IL)$85–$125Seasonal demand, limestone available
Mid-Atlantic (PA, NJ, NY)$100–$150Higher labor, dense market competition
New England (MA, CT, ME)$110–$160Short season, higher transport costs
Mountain West (CO, UT, MT)$100–$145Distance from plants, altitude adjustments
Pacific Northwest (WA, OR)$95–$140Rain delays, good aggregate access
California$110–$170Strict emissions, high labor costs
Hawaii$180–$300All materials imported by sea
Alaska$150–$250Very short season, remote logistics

💡 Tip: These are plant-gate prices. Add $10–$30 per ton for delivery within a 30-mile radius. For longer hauls, delivery costs increase by roughly $1.50–$2.50 per ton per additional mile. See our delivery and hauling cost guide for detailed distance-based pricing.

Factors That Affect Asphalt Prices

Understanding these cost drivers helps you time your purchase and negotiate better:

  • Crude oil prices — Liquid asphalt cement (the black binder) is a petroleum byproduct accounting for 50–60% of hot mix cost. When crude oil rises $10/barrel, expect HMA prices to increase roughly $5–$8 per ton with a 4–8 week lag.
  • Aggregate costs — Stone, sand, and gravel represent 25–35% of mix cost. Regions without local quarries pay significant transportation surcharges on aggregate, directly increasing mix prices.
  • Seasonal demand — Paving season in northern states runs May through October. Peak demand in July–August can push prices 10–20% above spring levels. Plants sometimes run double shifts, increasing labor costs that are passed through.
  • Plant distance — Hot mix must be placed before it cools below about 275°F. Practical delivery range is 30–60 miles from the plant. If you're beyond that range, prices jump due to insulated trailers and potential reheating requirements.
  • Mix specifications — Premium binders (polymer-modified, rubber-modified) can add $20–$60 per ton. RAP (reclaimed asphalt pavement) content reduces cost — mixes with 15–30% RAP can be $5–$15 per ton cheaper.
  • Plant type — Drum mix plants (continuous production) generally offer lower prices than batch plants due to higher throughput. Portable plants set up for DOT projects may offer competitive pricing for nearby projects.

Bulk vs. Small Quantity Pricing

The quantity you order significantly affects per-ton pricing. Here is how order size typically impacts cost:

Order SizeDelivery MethodPrice ImpactNotes
1–5 tonsPickup or small dump truck+$10–$20/ton above baseShort load surcharge likely ($50–$150)
5–15 tonsTandem dump truckBase priceMost common order size for driveways
15–22 tonsTri-axle dump truckBase priceOne full truck — most efficient
25–100 tonsMultiple trucks$3–$5/ton discountSchedule trucks in sequence
100+ tonsDedicated fleet$5–$10/ton discountNegotiate project rate with plant

Some plants sell hot mix by the pickup truck load — typically 1–3 tons in a standard full-size truck bed. This is the most expensive way to buy but works for small patch jobs. The plant gate price applies, and you avoid a delivery fee but assume temperature risk (material cools fast in an open bed). Beyond material costs, labor and installation typically represents the largest portion of your total paving budget.

Price Trends and Forecasting

Asphalt prices have followed an upward trend over the past decade, roughly tracking crude oil prices with some lag. Key trends to watch:

  • Oil futures — Monitor WTI crude oil prices. Every $10/barrel move translates to approximately a $5–$8/ton change in hot mix prices within 4–8 weeks.
  • State DOT lettings — When state DOTs let large highway contracts, regional asphalt demand spikes and prices follow. Check your state DOT's annual letting schedule.
  • Infrastructure spending — Federal infrastructure bills increase paving demand nationally. The 2021 Infrastructure Investment and Jobs Act allocated $110 billion for roads and bridges, sustaining demand and prices.
  • RAP availability — As more asphalt is recycled, the cost of mixes containing RAP decreases. Ask about RAP content options with your supplier — 15–30% RAP is standard and reduces cost without compromising quality.

Tips for Getting the Best Price

  • Get quotes from at least 3 asphalt plants within your delivery radius.
  • Order in full truckloads (15–22 tons) whenever possible to avoid short load surcharges.
  • Schedule your project for early spring or late fall when demand and prices are lower.
  • Ask about RAP-content mixes — they're typically $5–$15 cheaper per ton and perform well for driveways and parking lots.
  • For large projects (100+ tons), request a project-rate quote and commit to a delivery schedule for the best pricing.
  • Lock in pricing early — many contractors negotiate fixed tonnage prices with plants at the start of the paving season.

Frequently Asked Questions